kVA to Amps Calculator
Read the full-load current off a transformer, generator or UPS nameplate rated in kVA — a conversion that needs no power factor, because apparent power already contains it.
Last checked against the code
kVA to Amps Calculator
Updates as you type- Apparent power in VAkVA × 1,000
- —
- Divided byThe voltage, times 1.732 on three phase
- —
I = (kVA × 1,000) ÷ V single phase · I = (kVA × 1,000) ÷ (V × 1.732) three phase
How this is calculated
Transformers, generators and uninterruptible power supplies are all rated in kilovolt-amperes rather than kilowatts, and the reason is thermal. What wears out a winding is the heat produced by the current passing through it. That heating happens whether or not the current is doing anything useful at the far end, so the honest rating for a piece of equipment is the total current it can pass at its rated voltage — which is exactly what a kVA figure states.
Apparent power is that product: volts times amps, with no allowance for phase relationship. Rearranged for current, and with the kilo multiplied out, it gives the whole conversion:
Single phase: I = (kVA × 1,000) ÷ V
Three phase: I = (kVA × 1,000) ÷ (V × 1.732)
Notice what is absent. There is no power factor term anywhere in either line, and adding one is the mistake this page exists to head off. Power factor describes the relationship between apparent power and real power; a kVA rating is already on the apparent side of that relationship, so dividing by power factor moves the answer somewhere neither quantity lives. The result is a current figure inflated by roughly 1/PF — around 25% at a power factor of 0.8, which is enough to buy the wrong cable.
The 1.732 on three phase is the square root of three, and it belongs to the geometry of a three-phase system rather than to any code. Enter the line-to-line voltage alongside it: 208 or 480 in North American practice, 400 in most of Europe and Australia.
One more thing the formula assumes and the nameplate does not always say. On a transformer, the rating applies to both windings, but the voltage does not — so a single unit has two full-load currents that can differ by a factor of two or more. The converter answers for whichever winding voltage you give it, which means the voltage field is doing more work here than on any other page in this set.
Worked example
One full calculation with real numbers, so you can follow along and check the tool by hand.
A 75 kVA dry-type transformer stepping 480 V down to 208 V, three phase — the same unit the transformer sizing calculator works through, so the two pages can be read against each other.
Start on the primary. The rating is 75 kVA, which is 75,000 VA. The winding is 480 V, and it is three phase, so the divisor is 480 × 1.732 = 831.36. That gives 75,000 ÷ 831.36 = 90.21 A. This is the current the supply-side conductors carry and the basis for the primary overcurrent device under 450.3(B).
Now the secondary, same unit, same rating. The only thing that has changed is the voltage: 208 × 1.732 = 360.26, and 75,000 ÷ 360.26 =208.2 A. One transformer, one nameplate, and two currents that differ by a factor of 2.3.
That ratio is not a coincidence — it is the voltage ratio, 480 ÷ 208, turned upside down. A transformer moves a fixed quantity of apparent power, so lowering the voltage on one side necessarily raises the current on that side in exact proportion. Any answer where the low-voltage side carries less current than the high-voltage side is wrong before you check the arithmetic.
What would happen if power factor were applied. Suppose the load is a plant running at 0.8 and the temptation is to divide by it. The primary figure becomes 112.8 A rather than 90.21 A. Nothing about the transformer has changed; a 75 kVA unit at 480 V cannot pass 112.8 A whatever the load does, because 112.8 A at that voltage would be 93.8 kVA and the winding would be running 25% over its rating. The number is not merely conservative — it describes a machine that does not exist.
Visual comparison
| Rating | Full-load currentA |
|---|---|
| 15 kVA | 18.04 |
| 25 kVA | 30.07 |
| 37.5 kVA | 45.11 |
| 50 kVA | 60.14 |
| 75 kVA | 90.21 |
| 100 kVA | 120.28 |
| 112.5 kVA | 135.32 |
| 150 kVA | 180.43 |
| 225 kVA | 270.64 |
| 300 kVA | 360.85 |
| 500 kVA | 601.42 |
| 750 kVA | 902.14 |
| 1000 kVA | 1202.85 |
Source: Ratings from the standard transformer ladder; currents calculated at 480 V three-phase.
Reference tables
Use this table when you have a rating in hand and want the current at one of the four common supplies without opening anything. It is faster than the converter for the ratings that appear on most jobs, and it puts the four answers for a given machine side by side — which the converter, answering one voltage at a time, cannot.
Read across a single row and the pattern that governs every kVA conversion is visible at once. The 120 V figure is always twice the 240 V one, because halving the voltage doubles the current. The 208 V three-phase figure is smaller than the 240 V single-phase one despite the lower voltage, which surprises people until they remember the 1.732 in the denominator doing the work.
The equipment column matters more than it looks. Transformer ratings are continuous thermal ratings and the current shown is genuinely available all day. Generator and UPS ratings usually sit alongside a separate kW figure that will bind first on a high power factor load, so treat those rows as the current the output conductors must be able to carry rather than as capacity you can count on selling.
Ratings below 15 kVA are UPS and small generator sizes; the rest is the standard transformer ladder. Neither list is a code table — they are what manufacturers build, and a particular line may not offer every rung.
| Rating | Typically | 120 VA, 1-phase | 240 VA, 1-phase | 208 VA, 3-phase | 480 VA, 3-phase |
|---|---|---|---|---|---|
| 1 kVA | UPS | 8.33 | 4.17 | 2.78 | 1.2 |
| 3 kVA | UPS | 25 | 12.5 | 8.33 | 3.61 |
| 5 kVA | Generator | 41.67 | 20.83 | 13.88 | 6.01 |
| 7.5 kVA | UPS | 62.5 | 31.25 | 20.82 | 9.02 |
| 10 kVA | Generator | 83.33 | 41.67 | 27.76 | 12.03 |
| 15 kVA | Transformer | 125 | 62.5 | 41.64 | 18.04 |
| 25 kVA | Transformer | 208.33 | 104.17 | 69.4 | 30.07 |
| 37.5 kVA | Transformer | 312.5 | 156.25 | 104.09 | 45.11 |
| 50 kVA | Transformer | 416.67 | 208.33 | 138.79 | 60.14 |
| 75 kVA | Transformer | 625 | 312.5 | 208.19 | 90.21 |
| 100 kVA | Transformer | 833.33 | 416.67 | 277.58 | 120.28 |
| 112.5 kVA | Transformer | 937.5 | 468.75 | 312.28 | 135.32 |
| 150 kVA | Transformer | 1250 | 625 | 416.37 | 180.43 |
| 225 kVA | Transformer | 1875 | 937.5 | 624.56 | 270.64 |
| 300 kVA | Transformer | 2500 | 1250 | 832.74 | 360.85 |
| 500 kVA | Transformer | 4166.67 | 2083.33 | 1387.9 | 601.42 |
| 750 kVA | Transformer | 6250 | 3125 | 2081.85 | 902.14 |
| 1000 kVA | Transformer | 8333.33 | 4166.67 | 2775.8 | 1202.85 |
Common mistakes
Dividing by power factor as well
Far and away the most frequent error here, and it comes from good habits: the reader has just done a watts conversion where power factor belonged. Apply a 0.8 correction to a 75 kVA unit and 90 A becomes 113 A, so the secondary conductors and the panel get specified a size larger than the transformer can ever deliver.
Treating the kVA figure as if it were kW
A generator advertised at 100 kVA is typically 80 kW. If the job needs 100 kW of real output, that machine cannot supply it whatever the kVA number says. The two ratings are printed separately because the load decides which one binds first.
Using the wrong side of a transformer
A transformer has one kVA rating and two full-load currents. A 75 kVA unit stepping 480 V down to 208 V carries 90 A on the primary and 208 A on the secondary. Feeding the secondary conductors from the primary figure undersizes them by more than half.
Dropping the 1.732 on a three-phase winding
The square root of three is not optional and not a safety margin. Omit it and the answer comes out 73% high, which reads as plausible rather than obviously broken — a 45 kVA unit at 208 V becomes 216 A instead of 125 A.
Sizing the conductors for the nameplate rather than the load
Full-load current is what the equipment can deliver, not what your load draws. It is the right basis for the transformer’s own protection, but a feeder sized on a rating you will only ever use half of is money spent on copper that will never carry current.
NEC 2023 450.3
This tool provides planning estimates. Always verify final values against your local code and a licensed electrician.
Frequently asked questions
How many amps is a 75 kVA transformer?
On a 480 V three-phase winding, 90.21 A. On the 208 V secondary of the same unit, 208.2 A. Both come from the same rating, because current depends on the voltage the winding operates at as well as the kVA. Quoting "the amps" of a transformer without naming a side is how the secondary conductors end up half the size they need to be.
Why is there no power factor in this calculation?
Because the kVA figure already includes it. Apparent power is the product of voltage and the total current flowing, reactive part included — that is what a kVA rating measures, and it is why equipment is rated that way in the first place. Windings heat according to the current they carry, regardless of whether that current is doing useful work. Applying a power factor here would remove a component the rating was specifically written to contain.
What is the difference between kVA and kW?
kW is real power, the part that does work and shows up on an energy bill. kVA is apparent power, the product of voltage and current. They are related by the power factor: kW = kVA × PF. On a resistive load they are equal. On a plant running at 0.8, a 100 kVA supply delivers only 80 kW of useful output, and the missing 20 is not lost — it is reactive power moving back and forth without ever being consumed.
How many amps does a 10 kVA generator produce?
At 240 V single phase, 41.67 A. At 208 V three phase, 27.76 A. Check which the machine is wired for before choosing, because many small sets can be configured either way and the connection changes the answer by a third. Also check the kW rating: a 10 kVA set is often 8 kW, and a resistive load such as heating will hit that ceiling before it hits the kVA one.
Should I use the primary or the secondary voltage?
Whichever winding you are sizing conductors or protection for. Use the primary voltage to get the current on the supply side, which is what the primary overcurrent device and its feeder are sized around. Use the secondary voltage for everything downstream of the transformer. Run the converter twice — the two answers are both correct and they are not close to each other.
Does a UPS rated in kVA follow the same conversion?
The arithmetic is identical, but the kW rating usually binds first. A 10 kVA / 8 kW UPS is stating that it can supply 10 kVA of apparent power to a load whose power factor is 0.8 or worse, and 8 kW of real power to anything better than that. Modern IT loads sit near unity, so a rack of servers will exhaust the 8 kW long before the 10 kVA. Size from the kW figure and use this conversion for the current the output conductors carry.